Want to stay updated on the latest mining news?

Stay Informed – Subscribe to latest updates. We promise to send only relevant and valuable emails, just insights you care about!

iMetal Resources Intersects 16.65 Metres at 1.24 g/t Gold Within 62.25 Metres at 0.61 g/t Gold at Gowganda West – MiningIR


iMetal Resources Inc. has intersected 16.65 metres at 1.25 g/t gold within 62.25 metres at 0.61 g/t gold at its Gowganda West Gold Project, southwest of Timmins, Ontario. Drilling in the West Zone intersected broad levels of gold mineralization in multiple holes, with long intervals of gold mineralization encountered in two of the six holes completed during the program, complementing the spring 2023 discovery hole of 48.5m of 0.85 g/t Au starting at 316.5m (see News Release dated 2023-Jun-06).

Highlights:

  • IMGW-25-06 returned 0.424 g/t gold over 278.35 metres from 45.1 to 323.45 metres, which included several sub-intervals, including:
    • 1.019 g/t gold over 7.4 metres from 118.75 to 126.15 metres
    • 0.566 g/t over 80 metres from 154 to 234 metres
    • 0.610 g/t gold over 62.45metres from 261 to 323.45 metres, including
      • 1.239 g/t gold over 16.65 metres from 289.35 to 306 metres
  • IMGW-25-01 returned 0.419 g/t gold over 65.75metres from 276.7 to 342.45 metres, including
    • 0.868 g/t gold over 8 metres from 296.5 to 304 metres
    • 0.786 g/t gold over 5.8 metres from 315.95 to 321.75 metres
  • IMGW-25-03 returned 1.116 g/t gold over 6.2 metres from 342.75 to 348.95 metres
  • McFarlane Lake Mining Limited, contiguous to the northwest has identifed a parallel zone to it’s Juby Zone within the regional Ridout-Tyrrell Deformation Zone, the 826 Zone, which appears to trend into the West Zone.

“These results continue to expand the gold system at Gowganda West and demonstrate both broad mineralization and higher-grade internal intervals,” stated Saf Dhillon, President & CEO of iMetal. “The scale of the mineralized envelope, combined with its proximity to the Juby Deposit and the emerging 826 Zone, reinforces the structural significance of this corridor. We look forward to incorporating these results into our ongoing geological model and planning the next phase of drilling!”

commented iMetal President & CEO Saf Dhillon.

The drilling intersected the targeted host rocks that exhibited alteration patterns and mineralization similar to that which was intersected in the 2023 drill program. The dominant rock type intersected is a matrix supported greenish polymictic conglomerate composed of heterogenous centimetric to pluricentimetric round clasts with different colors. A percentage of the red clasts are magnetic but the matrix is not. Zones of moderate to pervasive hematization /potassic alteration, sericitization and silicification were noted in the drill holes. Mineralization included disseminated and clast-replacement controlled pyrite, while a few holes also intersected local chalcopyrite vein fractures or plurimillimetric clusters. Alteration intensity appears to be a control on elevated gold values. Pyrite content also shows a relationship with elevated gold values and intensity of alteration.

Table 1. 2025 Key Intervals

Hole ID from to length g/t Au Hole ID from to length g/t Au
IMGW-25-01 276.7 342.45 65.75 0.419 IMGW-25-06 45.1 323.45 278.35 0.424
including 296.5 304.5 8 0.868 including 70.4 74.45 4.05 0.908
including 315.95 321.75 5.8 0.786 including 98.5 142.25 43.75 0.410
  including 98.5 104.8 6.3 0.629
IMGW-25-03 289.1 296.9 7.8 0.549   and 118.75 126.15 7.4 1.019
IMGW-25-03 342.75 348.95 6.2 1.116 including 137.5 141 3.5 0.758
including 154 234 80 0.566
IMGW-25-05 275.2 277.9 2.7 1.016   including 160.5 179 18.5 0.964
IMGW-25-05 367 370.5 3.5 0.976   and 186.5 197 10.5 0.834
  and 200 208.5 8.5 0.746
All intervals are down hole widths.   and 218.8 229.5 0.819
True width is unknown at this time.. including 261 323.45 0.610
  including 261 271.5 10.5 0.658
  and 289.35 306 16.65 1.239
   including 295 304.8 9.8 1.873
  including 309.05 313 3.95 0.796

Drilling also intersected multiple dykes in all holes. Diabase ranged in width from 1.45 to 45.05 metres in width and did not return any elevated gold values, though elevated gold values were noted at the lower contacts in several holes. Fine-grained intermediate dykes range in width from 1 to 20.8 metres and carry gold values in some instances but not others.

Table 2. 2025 Drill Collar Table

Hole_ID 83Z17E 83Z17N Azimuth Dip Length
IMGW-25-06 502468 5270029 225 -45 336
IMGW-25-04 502443 5270069 225 -45 393
IMGW-25-01 502535 5269969 225 -45 411
IMGW-25-02 502574 5269916 225 -45 486
IMGW-25-05 502557 5270046 225 -45 543
IMGW-25-04 502454 5269956 225 -45 471

The Gowganda West property hosts a large package of gold prospective Timiskaming metasediments, approximately 7 km in strike and up to 5 km in width, that hosts all the gold mineralization thus far discovered on the property. Successive drill programs advancing to the southwest continued to intersect increasing alteration and gold values in suspected NW trending zones and lead directly to the IMGW23-04 discovery hole. The 48.5m gold interval is characterized by a coarse-grained to boulder-sized conglomerate, with moderate to pervasive silica alteration associated with a large intermediate-mafic dyke. Ther 2022 and 2023 drill programs appear to suggest a strong correlation between the intensity of the silica alteration and increased gold grades.

Figure 1. 2026 Drill Hole Locations

Gowganda West is an exploration-stage gold project about 100 km south-southeast of Timmins, Ontario; contiguous to McFarlane Lake Mining’s Juby Deposits Project in the Shining Tree Camp of the southern part of the Abitibi Greenstone Gold Belt; and also contiguous to the Knight project that is part of the Strategic Partnership between Orecap Invest Corp. and Agnico Eagle Mines Ltd. iMetal’s fall 2022 and spring 2023 drill program were successful in intersecting new gold trends in the SW section of the property. The Property also has multiple-ounce grab samples from trends that have yet to be drill tested.

Figure 3. All 2026 Drill Intervals

Hole ID from to length g/t Au Hole ID from to length g/t Au
IMGW-25-01 276.7 342.45 65.75 0.419 IMGW-25-05 205.4 207.5 2.1 0.980
IMGW-25-01 296.5 304.5 8 0.868 IMGW-25-05 212.7 214 1.3 0.475
IMGW-25-01 315.95 321.75 5.8 0.786 IMGW-25-05 275.2 277.9 2.7 1.016
IMGW-25-05 367 370.5 3.5 0.976
IMGW-25-02 376.8 386 9.2 0.295 IMGW-25-05 530 533 3 0.282
IMGW-25-02 416.2 427.55 11.35 0.324
IMGW-25-06 45.1 323.45 278.35 0.424
IMGW-25-03 259.9 288.6 28.7 0.286 IMGW-25-06 45.1 88.8 43.7 0.327
IMGW-25-03 267.9 283 15.1 0.380 IMGW-25-06 68.1 88.8 20.7 0.462
IMGW-25-03 289.1 296.9 7.8 0.549 IMGW-25-06 70.4 74.45 4.05 0.908
IMGW-25-03 342.75 348.95 6.2 1.116 IMGW-25-06 98.5 142.25 43.75 0.410
IMGW-25-03 460.3 461.3 1 1.095 IMGW-25-06 98.5 104.8 6.3 0.629
IMGW-25-06 118.75 126.15 7.4 1.019
IMGW-25-04 34.5 43.3 8.8 0.152 IMGW-25-06 137.5 141 3.5 0.758
IMGW-25-04 73 77 4 0.275 IMGW-25-06 154 234 80 0.566
IMGW-25-04 111 134 23 0.234 IMGW-25-06 160.5 179 18.5 0.964
IMGW-25-04 111 118.5 7.5 0.452 IMGW-25-06 186.5 197 10.5 0.834
IMGW-25-04 194 202.5 8.5 0.123 IMGW-25-06 200 208.5 8.5 0.746
IMGW-25-04 363 373 10 0.217 IMGW-25-06 218.8 229.5 10.7 0.819
IMGW-25-06 261 323.45 62.45 0.610
IMGW-25-05 123 127.15 4.15 0.296 IMGW-25-06 261 271.5 10.5 0.658
IMGW-25-05 138 138.5 0.5 1.135 IMGW-25-06 289.35 306 16.65 1.239
IMGW-25-05 145.5 148.5 3 0.438 IMGW-25-06 295 304.8 9.8 1.873
IMGW-25-05 205.4 216.55 11.15 0.321 IMGW-25-06 309.05 313 3.95 0.796
All intervals are down hole widths. True width is unknown at this time..

QA/QC

All samples were dispatched to ALS Minerals prep facilites at either Val D’Or or Lachine (Montreal) where they underwent standard preparation procedures of CRU-21 and PREP-31. All pulps were then dispatched to ALS Minerals North Vancouver to undergo the Au-AA24 procedure, a 50 gram gold fire assay with an AAS finish. Intervals of visible chalcopyrite underwent the ME-ICP41 procedure, again in North Vancouver. All ALS Minerals laboratories and prep labs are Standards Council of Canada (SCC) ISO/IEC 17025 accredited facilities and are independent of iMetal Resources Inc.

A rigorous QA/QC program is was instituted with a certified standard and a blank inserted at an interval of every thirty samples. Each 30th sample is also be duplicated. No anomalies were noted in the QA/QC data.

Qualified Person

The technical content of the New Release has been reviewed and approved by R.Tim Henneberry, P.Geo. (BC), a director of the Company and a Qualified Person under National Instrument 43-101.

About iMetal Resources Inc.

iMetal is a Canadian-based junior exploration company focused on the exploration and development of its portfolio of resource properties in Ontario and Quebec. The flagship property Gowganda West, is an exploration-stage gold project with a recent discovery hole of 48.5m at 0.85 g/t gold that borders the Juby Deposit and is located within the Shining Tree Camp area in the southern part of the Abitibi Greenstone Gold Belt about 100 km south-southeast of the Timmins Gold Camp. The 220-hectare Ghost Mountain property, 42 kilometres NE of Kirkland Lake, lies 5 kilometres W of Agnico Eagle’s Holt and Holloway Mine. Carheil is an exploration stage project with multi-metal potential and previous graphite results. The project is about 170 km north of Rouyn-Noranda in the Northern Abitibi Greenstone Belt.

ON BEHALF OF THE BOARD OF DIRECTORS,

Saf Dhillon
President & CEO

iMetal Resources Inc.
saf@imetalresources.ca
Tel. (604-484-3031)
Suite 550, 800 West Pender Street, Vancouver, British Columbia, V6C 2V6.
https://imetalresources.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This release may contain forward-looking statements or forward-looking information under applicable Canadian securities legislation that may not be based on historical fact, including, without limitation, statements containing the words “believe”, “may”, “plan”, “will”, “estimate”, “continue”, “anticipate”, “intend”, “expect”, “potential”, and similar expressions. Forward-looking statements involve known and unknown risks, uncertainties, and other factors which may cause the actual results, performance, or achievements of iMetal to be materially different from any future results, performance, or achievements expressed or implied by the forward-looking statements. Forward-looking statements or information in this release relates to, among other things, the potential to complete a transaction with the Vendor and the outstanding conditions to such a transaction. These forward-looking statements are based on management’s current expectations and beliefs and assume, among other things, the ability of the Company to successfully pursue its current development plans, that future sources of funding will be available to the company, that relevant commodity prices will remain at levels that are economically viable for the Company and that the Company will receive relevant permits in a timely manner in order to enable its operations, but given the uncertainties, assumptions and risks, readers are cautioned not to place undue reliance on such forward-looking statements or information. The Company disclaims any obligation to update, or to publicly announce, any such statements, events or developments except as required by law.



Source link

- Advertisement -
- Advertisement -
- Advertisement -